Hey there, I am Chirag Mehta and these are my updates for week 8 (04/09 - 10/09).
This week was more about submitting the proposal, and starting some POC in Prysm codebase.
Updates:
- As this week was the final one to submit proposal and due to some urgent circumstances I have been travelling throughout the week, so proposal was made by Manav as we(4 fellows) are working on the same project(different modules) ie, ePBS design with Inclusion list .
- So our proposal was common, had reviewed it, made some minor changes on the go.
- Have been looking to the p2p specs proposed by terence and was understanding in-depth about Potuz consensus specs.
References:
https://github.com/potuz/consensus-specs/blob/epbs/specs/_features/epbs/design.md
https://github.com/terencechain/consensus-specs/blob/e6ac60e5c91f826a818ef5ce938ed32da2a0fd7d/specs/_features/ePBS/p2p-design.md
Next Steps:
start on with codebase for POC and take on modules(as per proposal) to work on specific needs to complete as per the plan.