tasktag
  • NEW!
    NEW!  Connect Ideas Across Notes
    Save time and share insights. With Paragraph Citation, you can quote others’ work with source info built in. If someone cites your note, you’ll see a card showing where it’s used—bringing notes closer together.
    Got it
      • Create new note
      • Create a note from template
        • Sharing URL Link copied
        • /edit
        • View mode
          • Edit mode
          • View mode
          • Book mode
          • Slide mode
          Edit mode View mode Book mode Slide mode
        • Customize slides
        • Note Permission
        • Read
          • Only me
          • Signed-in users
          • Everyone
          Only me Signed-in users Everyone
        • Write
          • Only me
          • Signed-in users
          • Everyone
          Only me Signed-in users Everyone
        • Engagement control Commenting, Suggest edit, Emoji Reply
      • Invite by email
        Invitee

        This note has no invitees

      • Publish Note

        Share your work with the world Congratulations! 🎉 Your note is out in the world Publish Note No publishing access yet

        Your note will be visible on your profile and discoverable by anyone.
        Your note is now live.
        This note is visible on your profile and discoverable online.
        Everyone on the web can find and read all notes of this public team.

        Your account was recently created. Publishing will be available soon, allowing you to share notes on your public page and in search results.

        Your team account was recently created. Publishing will be available soon, allowing you to share notes on your public page and in search results.

        Explore these features while you wait
        Complete general settings
        Bookmark and like published notes
        Write a few more notes
        Complete general settings
        Write a few more notes
        See published notes
        Unpublish note
        Please check the box to agree to the Community Guidelines.
        View profile
      • Commenting
        Permission
        Disabled Forbidden Owners Signed-in users Everyone
      • Enable
      • Permission
        • Forbidden
        • Owners
        • Signed-in users
        • Everyone
      • Suggest edit
        Permission
        Disabled Forbidden Owners Signed-in users Everyone
      • Enable
      • Permission
        • Forbidden
        • Owners
        • Signed-in users
      • Emoji Reply
      • Enable
      • Versions and GitHub Sync
      • Note settings
      • Note Insights New
      • Engagement control
      • Make a copy
      • Transfer ownership
      • Delete this note
      • Save as template
      • Insert from template
      • Import from
        • Dropbox
        • Google Drive
        • Gist
        • Clipboard
      • Export to
        • Dropbox
        • Google Drive
        • Gist
      • Download
        • Markdown
        • HTML
        • Raw HTML
    Menu Note settings Note Insights Versions and GitHub Sync Sharing URL Create Help
    Create Create new note Create a note from template
    Menu
    Options
    Engagement control Make a copy Transfer ownership Delete this note
    Import from
    Dropbox Google Drive Gist Clipboard
    Export to
    Dropbox Google Drive Gist
    Download
    Markdown HTML Raw HTML
    Back
    Sharing URL Link copied
    /edit
    View mode
    • Edit mode
    • View mode
    • Book mode
    • Slide mode
    Edit mode View mode Book mode Slide mode
    Customize slides
    Note Permission
    Read
    Only me
    • Only me
    • Signed-in users
    • Everyone
    Only me Signed-in users Everyone
    Write
    Only me
    • Only me
    • Signed-in users
    • Everyone
    Only me Signed-in users Everyone
    Engagement control Commenting, Suggest edit, Emoji Reply
  • Invite by email
    Invitee

    This note has no invitees

  • Publish Note

    Share your work with the world Congratulations! 🎉 Your note is out in the world Publish Note No publishing access yet

    Your note will be visible on your profile and discoverable by anyone.
    Your note is now live.
    This note is visible on your profile and discoverable online.
    Everyone on the web can find and read all notes of this public team.

    Your account was recently created. Publishing will be available soon, allowing you to share notes on your public page and in search results.

    Your team account was recently created. Publishing will be available soon, allowing you to share notes on your public page and in search results.

    Explore these features while you wait
    Complete general settings
    Bookmark and like published notes
    Write a few more notes
    Complete general settings
    Write a few more notes
    See published notes
    Unpublish note
    Please check the box to agree to the Community Guidelines.
    View profile
    Engagement control
    Commenting
    Permission
    Disabled Forbidden Owners Signed-in users Everyone
    Enable
    Permission
    • Forbidden
    • Owners
    • Signed-in users
    • Everyone
    Suggest edit
    Permission
    Disabled Forbidden Owners Signed-in users Everyone
    Enable
    Permission
    • Forbidden
    • Owners
    • Signed-in users
    Emoji Reply
    Enable
    Import from Dropbox Google Drive Gist Clipboard
       Owned this note    Owned this note      
    Published Linked with GitHub
    • Any changes
      Be notified of any changes
    • Mention me
      Be notified of mention me
    • Unsubscribe
    <!-- wp:image --> <figure class="wp-block-image"><img src="https://23964531.fs1.hubspotusercontent-na1.net/hubfs/23964531/1%20(24).jpg" alt="Breaking Down CPM Project Scheduling for Small and Mid-Sized Contractors" /></figure> <!-- /wp:image --> <!-- wp:paragraph --> <p>If “CPM scheduling” makes you think of massive spreadsheets, expensive consultants, and a schedule that no one in the field actually uses—you’re not alone.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>But the truth is:<a href="https://onelink.to/tasktagapp"><u> </u><strong><u>CPM project management</u></strong></a> (Critical Path Method) isn’t just for mega-projects. Small and mid-sized contractors can use CPM principles to make projects more predictable, reduce rework, and keep crews aligned—<em>without</em> turning scheduling into a full-time desk job.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>This guide breaks CPM down in plain language, shows how to apply it pragmatically, and explains how tools like <a href="https://tasktag.com/"><strong><u>TaskTag</u></strong></a> (branded) can support execution by turning day-to-day jobsite communication into trackable work.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>If you’ve been reading <a href="https://portal.tasktag.com/blog"><strong><u>construction management blogs</u></strong></a> and still feel like CPM is “not for us,” this is meant to be the practical version.</p> <!-- /wp:paragraph --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>What is CPM project scheduling?</strong></h2> <!-- /wp:heading --> <!-- wp:paragraph --> <p><strong>CPM</strong> stands for <a href="https://portal.tasktag.com/blog/mastering-construction-project-management"><strong><u>Critical Path Method</u></strong></a>—a way to plan and manage a project by identifying:</p> <!-- /wp:paragraph --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li>the activities that must happen,</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>the order they must happen in (dependencies),</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>and which sequence of activities determines your finish date (the <strong>critical path</strong>).</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>Key CPM terms (translated)</strong></h3> <!-- /wp:heading --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li><strong>Activity:</strong> a piece of work (e.g., “Install underlayment”)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li><strong>Duration:</strong> how long it takes (e.g., 2 days)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li><strong>Dependency:</strong> what must happen first (e.g., “Deck repairs” before “Underlayment”)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li><strong>Critical path:</strong> the chain of activities with <strong>zero schedule slack</strong>—if any slip, the project finish slips</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li><strong>Float (slack):</strong> how much you can delay an activity before it affects the finish date</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:paragraph --> <p>You don’t need to become a scheduling expert to benefit. You just need a repeatable way to answer: <em>what’s truly driving the completion date?</em></p> <!-- /wp:paragraph --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>Why CPM matters more for smaller contractors than you think</strong></h2> <!-- /wp:heading --> <!-- wp:paragraph --> <p>Smaller teams often have:</p> <!-- /wp:paragraph --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li>fewer backup crews,</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>tighter cash flow,</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>less tolerance for rework,</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>and more schedule risk when one scope slips.</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:paragraph --> <p>CPM helps you avoid “we’re busy” as a substitute for “we’re on track.”</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>It’s also valuable for contractors working as subs or alongside <strong>general contractors in Houston</strong>, where schedule updates, coordination, and documentation expectations can be high.</p> <!-- /wp:paragraph --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>CPM in one simple example (roof replacement)</strong></h2> <!-- /wp:heading --> <!-- wp:image --> <figure class="wp-block-image"><img src="https://23964531.fs1.hubspotusercontent-na1.net/hubfs/23964531/1%20(25).jpg" alt="CPM in one simple example (roof replacement)" /></figure> <!-- /wp:image --> <!-- wp:paragraph --> <p>Let’s say you’re managing a <strong>roof replacement</strong>. Here’s a simplified CPM-style sequence:</p> <!-- /wp:paragraph --> <!-- wp:list {"ordered":true} --> <ol class="wp-block-list"><!-- wp:list-item --> <li>Mobilize + safety setup</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Tear-off</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Deck inspection + repairs</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Underlayment</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Flashing + penetrations</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Install roofing system</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Final inspection + punch</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Cleanup + closeout</li> <!-- /wp:list-item --></ol> <!-- /wp:list --> <!-- wp:paragraph --> <p>The CPM question is: which of those activities has <em>no wiggle room</em>?<br>Often, items like deck repair discovery or inspection timing can become critical because everything else depends on them.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>This is why CPM scheduling isn’t “extra”—it’s how you prevent surprises from becoming delays.</p> <!-- /wp:paragraph --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>The 5 CPM principles small/mid contractors should focus on</strong></h2> <!-- /wp:heading --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>1) Build the schedule around handoffs, not a giant task list</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>A common mistake is listing dozens of tasks but missing the <em>handoff points</em> where delays happen:</p> <!-- /wp:paragraph --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li>inspection approvals</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>material deliveries</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>area releases</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>trade handoffs</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:paragraph --> <p><strong>Practical approach:</strong><strong><br></strong> Start with 15–30 activities max, focused on milestones and dependencies. You can add detail later if it’s truly useful.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>2) Identify your true constraints (the “real” critical path)</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>Your critical path isn’t just the longest list of tasks—it’s the longest <strong>dependent</strong> chain.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>Typical constraints for small/mid contractors:</p> <!-- /wp:paragraph --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li>long lead materials</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>inspections</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>access restrictions</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>weather windows (especially roofing)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>limited crew availability</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:paragraph --> <p>This ties directly to an <strong>inspection workflow</strong>: if inspections aren’t scheduled, tracked, and verified, they become invisible schedule killers.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>3) Track progress in the field with evidence (not optimistic updates)</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>A CPM schedule that isn’t grounded in reality becomes a fantasy document.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>That’s where <strong>construction photo documentation software</strong> concepts matter—photos and structured updates are evidence that work actually happened and is ready for the next trade.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p><strong>TaskTag angle (branded):</strong><strong><br></strong> TaskTag helps teams keep jobsite decisions, tasks, and documentation connected in one place, so progress updates aren’t just “we’re done”—they can include tagged proof, notes, and next steps.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>4) Update weekly (minimum) and use the schedule to drive the next week’s plan</strong></h3> <!-- /wp:heading --> <!-- wp:image --> <figure class="wp-block-image"><img src="https://23964531.fs1.hubspotusercontent-na1.net/hubfs/23964531/1%20(26).jpg" alt="Update weekly (minimum) and use the schedule to drive the next week’s plan" /></figure> <!-- /wp:image --> <!-- wp:paragraph --> <p>Small teams don’t need daily schedule re-forecasting. But you do need a consistent rhythm:</p> <!-- /wp:paragraph --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li><strong>Weekly lookahead plan</strong> (next 2–3 weeks</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Review what slipped and why</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Update dependencies and constraints</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Assign next actions (who is removing which blocker)</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:paragraph --> <p>Even if you don’t run a full Last Planner System, this cadence keeps CPM useful.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>5) Tie labor reality to schedule reality</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>Schedule is time. Labor is time. If you don’t compare the two, you miss early warning signs.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>You don’t need complex systems here—just enough to see if you’re trending over.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>Many contractors already use tools like <strong>time tracking software for landscaping</strong> (or similar field time apps) for crews across service lines. The CPM win is using time data to confirm whether production rates match your plan.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>Example:</p> <!-- /wp:paragraph --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li>You scheduled “2 days for underlayment,” but labor hours show you’re at 80% of planned hours and only 40% complete—your critical path is at risk.</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>What software do you need for CPM scheduling?</strong></h2> <!-- /wp:heading --> <!-- wp:paragraph --> <p>For small and mid-sized contractors, think in layers:</p> <!-- /wp:paragraph --> <!-- wp:list {"ordered":true} --> <ol class="wp-block-list"><!-- wp:list-item --> <li><strong>Scheduling tool</strong> (CPM engine): where dependencies and dates live</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li><strong>Execution tool</strong>: where the field actually communicates and closes tasks</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li><strong>Documentation layer</strong>: photos, decisions, and proof for handoffs/closeout</li> <!-- /wp:list-item --></ol> <!-- /wp:list --> <!-- wp:paragraph --> <p>This is where <strong>building contractor tools</strong> like TaskTag fit well: not necessarily as the CPM engine, but as the execution layer that keeps tasks and updates from getting lost in texts and WhatsApp threads.</p> <!-- /wp:paragraph --> <!-- wp:paragraph --> <p>The real goal: your schedule shouldn’t be separate from how work happens.</p> <!-- /wp:paragraph --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>A simple CPM setup you can copy (fast start)</strong></h2> <!-- /wp:heading --> <!-- wp:paragraph --> <p>If you want to implement CPM without drowning:</p> <!-- /wp:paragraph --> <!-- wp:list {"ordered":true} --> <ol class="wp-block-list"><!-- wp:list-item --> <li>List 15–30 activities (milestones + handoffs)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Add dependencies (what must happen first)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Estimate durations (use history, not hope)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Identify the critical path (the “no slip” chain)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Add 3-week lookahead with owners for constraints</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Run weekly schedule reviews (30 minutes)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Tie field updates to tasks + photos (proof of completion)</li> <!-- /wp:list-item --></ol> <!-- /wp:list --> <!-- wp:paragraph --> <p>Works for:</p> <!-- /wp:paragraph --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li>tenant improvements</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>small commercial</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>remodeling</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>service-heavy contractors</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li><strong>roofing project management</strong> programs with repeated scope types</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>CPM success checklist (small/mid contractor edition)</strong></h2> <!-- /wp:heading --> <!-- wp:list --> <ul class="wp-block-list"><!-- wp:list-item --> <li>Your schedule has clear dependencies</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>You know the current critical path</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Inspections are planned and tracked (inspection workflow)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Field updates are evidence-based (photos + tasks)</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>You review weekly and adjust lookahead</li> <!-- /wp:list-item --> <!-- wp:list-item --> <li>Everyone knows what’s next and who owns it</li> <!-- /wp:list-item --></ul> <!-- /wp:list --> <!-- wp:paragraph --> <p>If those are true, CPM is working—regardless of project size.</p> <!-- /wp:paragraph --> <!-- wp:heading --> <h2 class="wp-block-heading"><strong>FAQ: CPM Project Scheduling for Small and Mid-Sized Contractors</strong></h2> <!-- /wp:heading --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>1) What does CPM mean in construction scheduling?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>CPM stands for Critical Path Method. It’s a scheduling approach that identifies the sequence of dependent activities that determines the project finish date.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>2) Is CPM project management only for large projects?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>No. <strong>CPM project management</strong> is especially helpful for small/mid contractors because it clarifies what can slip and what can’t—so you can focus limited resources on what truly drives completion.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>3) How detailed should a CPM schedule be for a small contractor?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>Start with 15–30 activities focused on milestones, handoffs, and constraints. Add detail only if it improves decisions in the field.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>4) How do inspections impact the critical path?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>Inspections often gate downstream work. A weak <strong>inspection workflow</strong> (unclear ownership, missing proof, delayed scheduling) can silently become your critical path.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>5) How does construction photo documentation software help CPM scheduling?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>It provides proof of progress and readiness for handoffs (e.g., “area ready for inspection”). Tagged photos and organized documentation reduce disputes and speed approvals.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>6) Does CPM apply to roof replacement and roofing work?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>Yes. Weather windows, material lead times, deck condition discoveries, and inspection requirements can quickly become critical path items in a <strong>roof replacement</strong> or broader <strong>roofing project management</strong> program.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>7) How can time tracking improve schedule control?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>Time tracking validates production rates. If you use <strong>time tracking software for landscaping</strong> or similar crew tools, you can compare planned vs actual labor to spot schedule risk early.</p> <!-- /wp:paragraph --> <!-- wp:heading {"level":3} --> <h3 class="wp-block-heading"><strong>8) Where does TaskTag fit into CPM scheduling?</strong></h3> <!-- /wp:heading --> <!-- wp:paragraph --> <p>TaskTag supports execution: turning jobsite conversations into tasks, keeping decisions organized, and attaching photos/updates to the work so schedule handoffs are clearer and more defensible.</p> <!-- /wp:paragraph -->

    Import from clipboard

    Paste your markdown or webpage here...

    Advanced permission required

    Your current role can only read. Ask the system administrator to acquire write and comment permission.

    This team is disabled

    Sorry, this team is disabled. You can't edit this note.

    This note is locked

    Sorry, only owner can edit this note.

    Reach the limit

    Sorry, you've reached the max length this note can be.
    Please reduce the content or divide it to more notes, thank you!

    Import from Gist

    Import from Snippet

    or

    Export to Snippet

    Are you sure?

    Do you really want to delete this note?
    All users will lose their connection.

    Create a note from template

    Create a note from template

    Oops...
    This template has been removed or transferred.
    Upgrade
    All
    • All
    • Team
    No template.

    Create a template

    Upgrade

    Delete template

    Do you really want to delete this template?
    Turn this template into a regular note and keep its content, versions, and comments.

    This page need refresh

    You have an incompatible client version.
    Refresh to update.
    New version available!
    See releases notes here
    Refresh to enjoy new features.
    Your user state has changed.
    Refresh to load new user state.

    Sign in

    Forgot password
    or
    Sign in via Google Sign in via Facebook Sign in via X(Twitter) Sign in via GitHub Sign in via Dropbox Sign in with Wallet
    Wallet ( )
    Connect another wallet

    New to HackMD? Sign up

    By signing in, you agree to our terms of service.

    Help

    • English
    • 中文
    • Français
    • Deutsch
    • 日本語
    • Español
    • Català
    • Ελληνικά
    • Português
    • italiano
    • Türkçe
    • Русский
    • Nederlands
    • hrvatski jezik
    • język polski
    • Українська
    • हिन्दी
    • svenska
    • Esperanto
    • dansk

    Documents

    Help & Tutorial

    How to use Book mode

    Slide Example

    API Docs

    Edit in VSCode

    Install browser extension

    Contacts

    Feedback

    Discord

    Send us email

    Resources

    Releases

    Pricing

    Blog

    Policy

    Terms

    Privacy

    Cheatsheet

    Syntax Example Reference
    # Header Header 基本排版
    - Unordered List
    • Unordered List
    1. Ordered List
    1. Ordered List
    - [ ] Todo List
    • Todo List
    > Blockquote
    Blockquote
    **Bold font** Bold font
    *Italics font* Italics font
    ~~Strikethrough~~ Strikethrough
    19^th^ 19th
    H~2~O H2O
    ++Inserted text++ Inserted text
    ==Marked text== Marked text
    [link text](https:// "title") Link
    ![image alt](https:// "title") Image
    `Code` Code 在筆記中貼入程式碼
    ```javascript
    var i = 0;
    ```
    var i = 0;
    :smile: :smile: Emoji list
    {%youtube youtube_id %} Externals
    $L^aT_eX$ LaTeX
    :::info
    This is a alert area.
    :::

    This is a alert area.

    Versions and GitHub Sync
    Get Full History Access

    • Edit version name
    • Delete

    revision author avatar     named on  

    More Less

    Note content is identical to the latest version.
    Compare
      Choose a version
      No search result
      Version not found
    Sign in to link this note to GitHub
    Learn more
    This note is not linked with GitHub
     

    Feedback

    Submission failed, please try again

    Thanks for your support.

    On a scale of 0-10, how likely is it that you would recommend HackMD to your friends, family or business associates?

    Please give us some advice and help us improve HackMD.

     

    Thanks for your feedback

    Remove version name

    Do you want to remove this version name and description?

    Transfer ownership

    Transfer to
      Warning: is a public team. If you transfer note to this team, everyone on the web can find and read this note.

        Link with GitHub

        Please authorize HackMD on GitHub
        • Please sign in to GitHub and install the HackMD app on your GitHub repo.
        • HackMD links with GitHub through a GitHub App. You can choose which repo to install our App.
        Learn more  Sign in to GitHub

        Push the note to GitHub Push to GitHub Pull a file from GitHub

          Authorize again
         

        Choose which file to push to

        Select repo
        Refresh Authorize more repos
        Select branch
        Select file
        Select branch
        Choose version(s) to push
        • Save a new version and push
        • Choose from existing versions
        Include title and tags
        Available push count

        Pull from GitHub

         
        File from GitHub
        File from HackMD

        GitHub Link Settings

        File linked

        Linked by
        File path
        Last synced branch
        Available push count

        Danger Zone

        Unlink
        You will no longer receive notification when GitHub file changes after unlink.

        Syncing

        Push failed

        Push successfully