# Testing EPS
*This is the README for the "Electrical Implementation Testing"-folder. There will be subdirectories for the different components.*
---
## Creation of this Readme
Every designer has to add the information of his board. It should be clear what functionalities the board should have. Please take a look at the MOVE III requirements (link below). Every requirement should be listed.
Your tasks:
* edit the general fuctions of the board
* check all the reqirements of MOVE III that apply to your board
You can track your time in [this issue](https://gitlab.lrz.de/move/Electrical/eps_hardware/-/issues/100)
Helpful links:
* [MOVE III requirements](https://twcloud.lrt.lrg.tum.de:8443/webapp/collaborator/document/51e75f8c-f63e-41ab-9f97-947ea2087fb4?viewId=38c2302a-2621-4f1e-9496-f3cbab8ade9c&viewType=model§ionId=627d192c-81fe-4358-b33a-604c53b71289) (VPN might be necessary)
---
I. Basic hardware testing (Is there current? Are all ICs properly soldered?)
II. Basic software testing (is the board flashable?)
III. Build a (online) test setup in the cave. (get someone from Software and make a step by step setup around the boards)
IV. Advanced software testing (is the communication working? is the pre-made software working fine?)
V. Testing all functions of the individual boards
VI. Test the crossover (do the boards interact properly together?)
## SSB
Purpose: Development board for subsystems
Designer: Jona
Epic:
###
### Who should test?
## Backplane
Purpose: Connect all subsystems
Designer: tbd
### Functions that should be tested
- Switches
- Communication
- Power Supply
### Who should test?
## Battery Board
Purpose:
Responisble: Christian, Yordan
### Functions that should be tested
* mechanical stability
* cell voltage balancing
* constant voltage output
* load testing
### Who should test?
## Cricket Board
Purpose: Ground communication
Designer: Albin (Zsofia)
### Functions that should be tested
### Who should test?
## BCR
Purpose: Make the charging more efficient
Designer: Selina
### Functions that should be tested
- MPPT algorithm
- Test with actual solar cells
- Enough power for satellite?
## UVP
Purpose: Prevent the system of a short circuit
Designer: Marc
Epic: *insert link here*
### Functions that should be tested
- Sinus-squarwave convertion of Trigger
- Hysteresis
- Maximum current
- On-Off caracteristics
*Issue-Link, required hardware, who tested, date of testing, testing result (failed, uncertain, in progress, not tested, passed), tested functionality, how was it tested, test setup(cave/student lab/...), comments*
| Nr. | Tested functionality | Issue link | Date of testing | Tested by | Required hardware | Test setup | Testing procedure | Testing results | Comments |
| --- | -------------------- | ---------- | --------------- | ---------- | ----------------- | ---------- | ----------------- | --------------- | -------- |
| | | | | | | | | | |
### Who should test?