# TripleO CI Planning Meeting Notes 2023 ###### tags: `Meeting` **History:** * https://hackmd.io/P5sTPMSBREe5kBS_4jDhIg * https://hackmd.io/O0vGx277QDeDWQVhhm66aw * https://hackmd.io/RzlngcRmR72IJi7hfmVTww **Gmeet:** meet.google.com/avd-ijsb-ejt **Etherpad links for PTG** * https://etherpad.opendev.org/p/antelope_ptg_tripleoci * https://etherpad.opendev.org/p/tripleo-antelope-topics ## Team meeting pinglist alias: @ci-framework-team --- --- --- --- ## 2023-10-05 Unified Sprint 86 Planning **Attendees:** ananya, bhagyashris, rlandy, jgilaber, marios :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members Oct 05 to 0ct 25 (it's 14 days - $your_PTO_day) 1. Ronelle: 14 2. Marios: 13 3. Chandan: 12 4. Bhagyashri: 12 (24th OCt Holiday in India) might be one PTO 5. Pablo: 13 (1 public holiday) 6. Soniya: 7. Ananya: 8. Douglas: 9. Dariusz: 12 (planning 2 days off) 10. Cedric: 14 11. Joan: 13 (Oct 12th public holiday) > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### EoD > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 EoD | From | To | Person | | -------- | -------- | -------- | |6-Oct-2023 |12-Oct-2023|chandan | |13-Oct-2023|19-Oct-2023|cedric | |20-Oct-2023|26-Oct-2023|dariusz | > next retrospective : Bhagyashri 25th Oct :watch: (target: +0:15) + ### Ideas for improvement to sprint process Suggestions on where to put these in our scrum board? * Explore BM based CI (IBM and Vexx BMaaS) * https://issues.redhat.com/browse/OSP-23874 * Find a replacement tool for HackMD: Lets go with gdoc for a sprint and retro back * obsidian + syncthing? * plain jira? * notion? : +1 ananya, * gdoc? * (we have a drive share already, we may create a structure there) * wiki? * Gitlab issues and ReadME: +1 ananya * paid hackmd? : +1 ananya, +1 bhagyashris * running https://github.com/hackmdio/codimd somewhere? : +1 ananya * HackMD - change permissions to private? ¯\\_(ツ)_/¯ ### New topics or demos or education for KT call * data plane adoption jobs - debug/logs etc (marios/joan) * KT session with Jason from Scale team on 19 Oct ### New work item discovered by the team * JIRA backlog clean up : take a look at your jiras and clean them) * JIRAs to use for parenting * Suggested parents: * https://issues.redhat.com/browse/OSP-23874 * https://issues.redhat.com/browse/OSP-29180 * https://issues.redhat.com/browse/OSP-23873 * CI Framework - https://issues.redhat.com/browse/OSP-29278 * Scale team engagement * Validated Architecture EPIC Jira: https://issues.redhat.com/browse/OSP-23873 * [poc]using beaker cli via zuul to provision downstream baremetal nodes: under https://issues.redhat.com/browse/OSP-23873 * Tempest work ### Words from PM (Ronelle/Marios) ### Words from UA (Soniya VyaS) * (soniya29) Bugzilla to Jira transition * I will plan a KT for the new processes and stuffs in the bugzilla as I am back from PTO * we can introduce and give a prior intimation in Planning meeting, I have already dropped a mail regarding this * For further information please refer the following links:- 1. https://docs.engineering.redhat.com/display/OSP/Jira+for+Red+Hat+OpenStack+Platform 2. https://docs.engineering.redhat.com/pages/viewpage.action?spaceKey=OSP&title=OSP+Jira+Epic+Flow 3. https://docs.engineering.redhat.com/display/OSP/OSP+Jira+Bug+Flow 4. https://docs.engineering.redhat.com/display/OSP/Jira+for+Red+Hat+OpenStack+Platform :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-10-03 TC/UA/PM planning for sprint 86 ## 2023-10-03 TC/UA/PM planning for sprint 86 * (soniya29) Bugzilla to Jira transition * I will plan a KT for the new processes and stuffs in the bugzilla as I am back from PTO * we can introduce and give a prior intimation in Planning meeting, I have already dropped a mail regarding this * For further information please refer the following links:- 1. https://docs.engineering.redhat.com/display/OSP/Jira+for+Red+Hat+OpenStack+Platform 2. https://docs.engineering.redhat.com/pages/viewpage.action?spaceKey=OSP&title=OSP+Jira+Epic+Flow 3. https://docs.engineering.redhat.com/display/OSP/OSP+Jira+Bug+Flow 4. https://docs.engineering.redhat.com/display/OSP/Jira+for+Red+Hat+OpenStack+Platform * (rlandy) Min tasks * validated arch * dev preview 2 * JIRA close out * Moving off hackmd --- --- --- --- ## 2023-09-14 Unified Sprint 85 Planning **Attendees:** :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members Sept 14 to Oct 4 (it's 14 days - $your_PTO_day) 1. rlandy: 12 (out on 25, 29) 2. marios: 14 3. chandan: 11- (29th Sep - Travelling for PyCon india 2023, 19th& 02nd Public Holiday) 4. Jiri 5. Bhagyashri: 10 Days (19th Sept and 2nd Oct - Holidy in India + 2 PTO) 6. Pablo: 14 7. Sandeep: 7 (3 PTO + 1 public holiday + last workind day - 29th Sept) 8. Soniya: 10(2 public holidays + 2 ptos) 9. arxcruz: 14 10. Ananya: 10 (3 PTO + holiday on 3 oct) 11. Douglas: 14 12. Dariusz: 13. Cedric: 14. Adrian: 14 15. Joan: 13 (25th Sep- public holiday) 16. Dor: 17. Rachael: > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- 15-Sep-2023| 21-Sep-2023| dariusz/adrian 22-Sep-2023| 28-Sep-2023| soniya 29-Sep-2023| 5-Oct-2023 | ananya > next retrospective : 4 Oct - Bhagyashri :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Support the ci-framework ### New topics or demos or education for community call - baremetal debug: sandeep 28 Sept - repo-setup new updates - 5 mins - 21sept - downstream artifacts - 21 sept ### New work item discovered by the team * ffu job (train teardown) ### Words from PM (Ronelle/Marios) ### Words from UA (Soniya Vyas) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-09-12 TC/UA/PM planning for sprint 85 * Not planning on adding anything new - looking to close out tasks for this quarter * Need a Q4 brainstorm about 1 week before quarter starts * Triage of tasks we don't want to take forward - noting we will be working with a smaller team * Validated architecture work will be a major focus and getting adoption work set up downstream - with wallaby removla/minimal --- --- --- --- ## 2023-08-21 Unified Sprint 84 Planning **Attendees:** rlandy, :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members 24 Aug 13 Sept (it's 14 days - $your_PTO_day) 1. rlandy: 13 - holiday Sep 4 2. marios: 3. chandan: 4. Jiri 5. Bhagyashri: 6. Pablo: 11 (04-06.09 off) 7. Sandeep: 8. Soniya: 12 (may take 2 ptos) 9. arxcruz: 10. Ananya: 11. Douglas: 13 (Sep 7th - holiday) 12. Dariusz: 8 (September 08-17 training) 13. Cedric: 10 (25.08, 11-13.09 off) 14. Adrian: 15. Joan: 12 (25.08 PTO, 11.09 public holiday) 16. Dor: 17. Rachael: > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- 25-Aug-2023 |31-Aug-2023| bhagyashri 1-Sep-2023 |7-Sep-2023| doug 8-Sep-2023 |14-Sep-2023| sandeep > next retrospective : 13 Sept Arx :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Remove upstream wallaby proposal after Train proposal http://pastebin.test.redhat.com/1108000 * Team to decide what happens with the jobs of our repo * Not rely on only Vexx + start using IBM cloud * Pablo/Cedric stabilizes on Vexx and then we move train * Don't run deploy/e2e on patches that are unable to merge dur to typo, lint issues and so on * Card in Q4/next year (spike exists: https://issues.redhat.com/browse/OSP-27644) * Must gather: * Add check jobs for must-gather repo where we build must-gather image in check. * Drop duplication in gather step https://github.com/openshift/release/blob/master/ci-operator/step-registry/openstack-k8s-operators/gather/openstack-k8s-operators-gather-commands.sh#L6-L144 ### New topics or demos or education for community call ### New work item discovered by the team * left dev preview - Go/No Go * blocking issue https://issues.redhat.com/browse/RELDEL-2427 * proposed validated arch 1 https://docs.engineering.redhat.com/pages/viewpage.action?spaceKey=OSP&title=Validated+Architecture+1 * Chandan can explain more on Monday's call (spike already exists) * scenario work https://hackmd.io/T80n0V1_QI6JKxukDiJBAQ (feature parity) * Train teardown? Possible wallaby tear down prep if proposal goes through (go following sprint?) * Job move for ci-framework new layout * Using IBM cloud for framework jobs * Moving jobs off prow/hive to zuul * depends-on on downstream - get that working for the framework * later * QE (dev scripts integration into the framework) * Monday call pavel * ### Words from PM (Ronelle/Marios) * Team needs drinks ### Words from UA (Dariusz/Soniya) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-08-22 TC/UA/PM planning for sprint 84 * left dev preview - Go/No Go * proposed validated arch 1 https://docs.engineering.redhat.com/pages/viewpage.action?spaceKey=OSP&title=Validated+Architecture+1 * scenario work https://hackmd.io/T80n0V1_QI6JKxukDiJBAQ (feature parity) * Train teardown? Possible wallaby tear down prep if proposal goes through (go following sprint?) * Job move for ci-framework new layout * Using IBM cloud for framework jobs * Moving jobs off prow/hive to zuul * depends-on on downstream - get that working for the framework * QE (dev scripts integration into the framework) --- --- --- --- ## 2023-08-03 Unified Sprint 83 Planning **Attendees:** ananya, bhagyashris, jgilaber, soniya29 :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members Aug 03 to Aug 23 (it's 14 days - $your_PTO_day) 1. rlandy: 13 (Recharge day) 2. marios:10 (recharge + out 21-01August ) 3. chandan: 4. Ignacio: 15 (Holiday Spain), 18 (Recharge Day) 5. Bhagyashri: 12( 15th Holiday in India and recharge on 18th ) 6. Pablo: 9 (recharge + 4 PTOs (7-10 Agst)) 7. Sandeep: 12 (Recharge on 18th and Public holiday on 15th) 8. Soniya: 12 (Recharge day + public holiday) 9. arxcruz: 10. Ananya: 13 (Recharge day on 18th) 11. Douglas: 12 (Recharge (probably on 14th) and holiday on 15th) 12. Dariusz: 13. Cedric: 12 (15 + 18) 14. Adrian: 15 (Holiday Spain), 18 (Recharge Day) 15. Joan: 7 (11-18th PTO) 16. Dor: 17. Rachael: 18. Jiri: 13 > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- 4-Aug-2023 |10-Aug-2023| sandeep 11-Aug-2023|17-Aug-2023| chandan 18-Aug-2023|24-Aug-2023| cedric > next retrospective : Ignacio: 23 Aug :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Logging: (Ananya will add a backlog in Jira) * Maybe study if it's possible to reduce how verbose the log gathering thing is https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751&view=detail&selectedIssue=OSP-27262 * we need to collect logs from edpm compute node https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751&view=detail&selectedIssue=OSP-27261 * Generic Job name for easier search (Ananya will add a jira card - needs design/brainstorm session next KT session) * Reviews call... what should change? time? format? (slack?) - (people ping on channel on demand if review list is empty) * CRC and certificate lifetime - we'll hack this around once we get the network stable in extracted CRC * Start looking and provide feedback to the dashboards (schedule it on KT session) * Multinode (thinking about ceph) crc based deployments * Add dpull job to operators to avoid PR merging that have open PR as depends-on. (Add jira story) https://issues.redhat.com/browse/OSP-27263 * https://www.dpulls.com/ * Dpulls allows you to specify dependencies between pull requests and creates a status check to make sure the PRs are merged in the right order, keeping your builds green and devs happy * Ex. https://github.com/openstack-k8s-operators/osp-director-operator/pull/886 (see dpulls job) ### New topics or demos or education for community call ### New work item discovered by the team * Request for dashboard and debug training session from dev * dev preview * Main Story: https://issues.redhat.com/browse/OSP-27010 * [new regsitry namespace to push index](https://issues.redhat.com/browse/OSP-27115) * [builds of index](https://issues.redhat.com/browse/OSP-27116) * [rework the line to consume the rebuilt operators](https://issues.redhat.com/browse/OSP-27117) * [ensure EDPM job with VM launch is included](https://issues.redhat.com/browse/OSP-27118) * Stabilize kuttl tests * minor update dstream ... TBD https://issues.redhat.com/browse/OSP-26629 * d/stream focus * eg data plane adoption there https://issues.redhat.com/browse/OSP-26786 * dashboarding: * dlrn user in place to add to current dashboard (use the moved version) * downstream inclusion in dashoard * any usability feedback (github actions jobs etc.) * CI for all Operators? * https://docs.google.com/spreadsheets/d/1Zwm2cDZpnVZIMb239f5xm_LIJIx-KvI6Tymd4ke-Q3A/edit#gid=302149951 ### Words from PM (Ronelle/Marios) ### Words from UA (Soniya VyaS) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-08-01 TC/UA/PM planning for sprint 83 * New work items * dev preview * Main Story: https://issues.redhat.com/browse/OSP-27010 * [new regsitry namespace to push index](https://issues.redhat.com/browse/OSP-27115) * [builds of index](https://issues.redhat.com/browse/OSP-27116) * [rework the line to consume the rebuilt operators](https://issues.redhat.com/browse/OSP-27117) * [ensure EDPM job with VM launch is included](https://issues.redhat.com/browse/OSP-27118) * minor update dstream ... TBD https://issues.redhat.com/browse/OSP-26629 * d/stream focus * eg data plane adoption there https://issues.redhat.com/browse/OSP-26786 * dashboarding: * dlrn user in place to add to current dashboard (use the moved version) * downstream inclusion in dashoard * any usability feedback (github actions jobs etc.) * CI for all Operators? * https://docs.google.com/spreadsheets/d/1Zwm2cDZpnVZIMb239f5xm_LIJIx-KvI6Tymd4ke-Q3A/edit#gid=302149951 --- --- --- --- ## 2023-07-13 Unified Sprint 82 Planning **Attendees:** soniya29, ibernal, bhagyashris,ysandeep, Chandan, arxcruz, marios, jgilaber, afuscoar, dpinhas :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members July 13 to Aug 02 (it's 14 days - $your_PTO_day) 1. rlandy: 2. marios: 13 (out one day) 3. chandan: 14 4. Ignacio: 9 (out Jul 24 to Jul 28) 5. Bhagyashri: 13 (May will take 1 or 2 PTO's not fixed yet) 6. Pablo: 14 7. Sandeep: 8 (Out from 14th July to 24th July) 8. Soniya: 12(24th July and 22nd July) 9. arxcruz: 13 (need to confirm the dates) 10. Ananya: 11 (out from 13th to 17th) 11. Douglas: 14 12. Dariusz: 13. Cedric: 11 (out Jul 28 -> Aug 2) 14. Adrian: July 25 (holiday) 15. Joan: 9 (out Jul 24 to Jul 28) 16. Dor: 14 17. Rachael: 18. Jiri: 19. psedlak: 24 July - 04 Aug > Total team days (14 days for 17 team members (+1 in RR shift)): ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- 14-Jul-2023 |20-Jul-2023| doug 21-Jul-2023 |27-Jul-2023| soniya 28-Jul-2023 | 3-Aug-2023| ananya > next retrospective : Ronelle on 2 Aug :watch: (target: +0:15) + ### Ideas for improvement to sprint process ### New topics or demos or education for community call From retro: * data plane adoption job instability (party resolved by Joan memcached but also nested crc issues ### New work item discovered by the team * [Not new]Rethinking CI Scenario files - https://hackmd.io/T80n0V1_QI6JKxukDiJBAQ?view ### Words from PM (Ronelle/Marios) ### Words from UA (Soniya Vyas) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + * psedlak: update about qe planning/goals (for q3 as also for later) * https://docs.google.com/document/d/1w20k3jIS8oJmTDM0n633-G-RnFFklTb6vqxDjArPerQ/edit ### End Of Meeting --- --- ## 2023-07-11 TC/UA/PM planning for sprint 82 --- --- ## 2023-06-22 Unified Sprint 81 Planning **Attendees:** ananya, arxcruz, cjeanner, afuscoar,jgilaber, ysandeep, rlandy, rachael, psedlak, chandan :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members June 22 to July 12 (it's 14 days - $your_PTO_day) 1. rlandy: 10 - PTO July 10, 11, 12 (through 18) and July 4th 2. marios: 13 (one pto tbd) 3. chandan: 13 days (29th June-public holiday) 4. Ignacio 5. Bhagyashri: 13 (29th june - Public holiday) NOT planned PTO yet 6. Pablo: 14 7. Sandeep: 12 (29th june - Public holiday + 30th june - PTO) 8. Soniya: 9. arxcruz: 10. Ananya: 11. Douglas: 9 (PTO on Jun 26th-30th) 12. Dariusz: 13. Cedric: 13 (23rd of June public holiday) 14. Adrian: 15. Joan: 14 16. Dor: 14 17. Rachael: 13 (29th June public holiday) 18. Jiri: 11 (PTO on July 3rd-7th) > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- 23-Jun-2023 | 29-Jun-2023 | cedric 30-Jun-2023 | 6-Jul-2023 | bhagyashri 7-Jul-2023 | 13-Jul-2023 | sandeep > next retrospective : 12 July - Soniya :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Create a list of improvements for documentation * https://issues.redhat.com/browse/OSP-24446 * Get clarity on supported envs - for customer and CI * Ananya will add a jira card to track this * (SNO topic: https://issues.redhat.com/browse/OSP-25844) * (psedlak) likely related to documenting https://issues.redhat.com/browse/OSP-25987 * KT how to report outages to forum-testplatform (ananya will put it on kt list) * Ananya will add Sandeep to the KT doc thingy * Jira-CIX workflow for next gen jobs * Revisit on friday's design call ### New topics or demos or education for community call * KT how to report outages to forum-testplatform (ananya will put it on kt list) ### New work item discovered by the team * (rlandy) Downstream DLRN security/auth * (ysandeep) We need a OVB like project if we go to SNO route so that we can provision baremetal nodes. * (cjeanner) We need to get in touch with Security DFG (over Q3) for SSML and related company wide security goals * (marios) degraded antelope container promotion line (current-podified vs podified-ci-testing) * (ysandeep) Need discussion if we need release files for defining vars. * https://redhat-internal.slack.com/archives/C04SKQ5KSJ0/p1687341197051549 * (cjeanner) in ci-framework, move ci/playbooks to scenarios/playbook * https://issues.redhat.com/browse/OSP-25854 * goal: keep clean tree, expose existing "receipts" and so on * (rlandy) downstream gerrit to gitlab ### Words from PM (Ronelle/Marios) * Bandwidth of wider team (who are with the CI team) * Should the CI team take up the "add ci for all operators" tasks https://docs.google.com/spreadsheets/d/1Zwm2cDZpnVZIMb239f5xm_LIJIx-KvI6Tymd4ke-Q3A/edit#gid=302149951 * Lets look at the backlogs to see if they are relevant still * Google doc for q3 tasks brainstorm (follow up next thursday) https://docs.google.com/document/d/1gnJ4oIi4ufDCGK5TxqSwxHkVgrqM1Wb3fJqsWAi7RcI/edit ### Words from UA (Soniya Vyas) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-06-21 TC/UA/PM planning for sprint 81 * Bandwidth of wider team (who are with the CI team) * Should the CI team take up the "add ci for all operators" tasks * Lets look at the backlogs to see if they are relevant still * Google doc for q3 tasks brainstorm (follow up next thursday) Goes to backlog: TRIPLEOCI-1039, OSP-24497, OSP-21576, , OSP-24501 - move the task to different place and close - OSP-25239 - ping david --- --- ## 2023-06-01 Unified Sprint 80 Planning **Attendees:** ananya, Chandan, marios, arxcruz, rachael, jgilaber, psathyan :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members June 01 - June 21 (it's 14 days - $your_PTO_day) 1. rlandy: 12 (holiday Jun 19) 2. marios: 13 (day of learning 2 June) 3. chandan: 13 (Learning day tomorrow) 4. Ignacio 5. Bhagyashri: 6. Pablo: 7 (5 PTOS) 7. Sandeep: 13 (day of learning 2 June) 8. Soniya: 9 (pto from 15 to 21) 9. arxcruz: 14 10. Ananya: 12 (2 PTOs) 11. Douglas: 13 (holiday on June 8th) 12. Dariusz: 13. Cedric: 12 (DoL + June 8th public holiday) 14. Adrian: 15. Joan: 13 (public holiday June 5th) 16. Dor: 17. Rachael: 12 (Day of learning, PTO June 6th) 18. psathyan: 13 > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Date | Date | RuckRover -|-|- 2-Jun-2023 | 8-Jun-2023 | ananya 9-Jun-2023 | 15-Jun-2023 | arx 16-Jun-2023 | 22-Jun-2023 | chandan > next retrospective : marios - 21 June :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Do any of the new team members want to host retro? We can add you to the retro rotation if interested. * Adding Pablo to RR * KT to Pablo * Add him to RR alias on slack * * Adding Pablo, Joan, Adrian, Ignacio to Retro * RR tool * Decide if Antelope/Master will report to DLRN * Decide if we will be using RR tool in future * TO do : add card to board * The new jobs can follow the component promotion workflow * Add ci-framework reviews to Review list, join review list * RR * one thread per cix * RRs working on improvement during light shifts * Team will start creating Github issues for CI Framework ideas for improvement ### New topics or demos or education for community call ### New work item discovered by the team * internal cockpit needs to move by end of Q3 ### Words from PM (Ronelle/Marios) * Day of learning * All CI knowledge transfer links are included in: https://docs.engineering.redhat.com/display/OSP/CI+Framework+-+Reference+Material+and+Knowledge+Transfer * Prod Sec Training https://docs.google.com/spreadsheets/d/1VwYYOnJ6WBFxtcCYNztGchsnWLkvIwmeWS_qj06rtAI/edit#gid=1910046556 * EnvTest bootcamp https://lists.corp.redhat.com/archives/rh-openstack-dev/2023-May/002492.html * Data Plane Adoption bootstrap and office hours: https://docs.google.com/spreadsheets/d/1EhNC-3YvjZb6cn6s_Jo_jH15B5KKZlub-gfcqQZ7Vms/edit#gid=769287580 * NextGen EnvTest bootcamp session on 2nd of June (days of learning) Meeting: http://meet.google.com/zqh-znvx-uzx Friday June 2, 2023 at 12:30 PM UTC * Doc NG review - volunteers pls * thank you Sandeep, Chandan, Marios :) ### Words from UA (Soniya Vyas) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 * TRIPLEOCI-1339 and OSP-24650 goes to RR improvement story * :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-05-30 TC/UA/PM planning for sprint 80 --- --- --- --- ## 2023-05-11 Unified Sprint 79 Planning **Attendees:** soniya29, bhagyashris, chandan, arxcruz, jgilaber, dviroel, :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members May 11 to May 31 (it's 14 days - $your_PTO_day) 1. rlandy: 11 days (out 26 and memorial day and recharge 12) 2. marios: 11 days (out 18,19 May & recharge day 12) 3. chandan: 13 days (Recharge day) 4. Ignacio: 13 (recharge day), 15 (holiday in Spain) 5. Bhagyashri: recharge day 12th may (may be 1 or 2 PTO not planned yet) 6. Pablo 7. Sandeep: 12 days(recharge day, PTOs not planned yet - Will give headsup if plan changes) 8. Soniya: 12 days [recharge day + 17th May] 9. arxcruz: 11 (RD and two public holidays) 10. Ananya: 10 (2 public holidays, recharge day and a PTO) 11. Douglas: 13 (recharge day) 12. Rachael: 13. Cedric: 14. Adrian: 13 (recharge day), 17 (holiday in Spain) 15. Joan: 13 (recharge day) 16. Dor: 11 (rechargeday and 17-18th PTO) 17. Jiri: 13 (recharge day) > Total team days (14 days for 15 team members (+1 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- 12-May-2023 | 18-May-2023 |doug 19-May-2023 | 25-May-2023 |sandeep 26-May-2023 | 1-Jun-2023 |soniya > next retrospective : Sandeep 31 may :watch: (target: +0:15) + ### Ideas for improvement to sprint process * try to find a better slot for retro calls (current time is 3:00 pm UTC) * 1 pm utc: ysandeep, marios, jgilaber, doug, bhagyashris, soniya29, afuscoar * 2 pm utc: ysandeep, marios, jgilaber, doug, jmacku * 3 pm utc: marios, jgilaber, doug, * tuesday 1:30 pm utc: +1(chandan), marios, ysandeep, bhagyashris, jgilaber,jmacku, soniya29, ibernal, afuscoar, doug, arxcruz * AI: touch base with ananya regarding the retro calls and confirm about any clashes * OSP 244420: ananya ..can we close this out? ### New topics or demos or education for KT https://docs.engineering.redhat.com/display/OSP/CI+Framework+-+Reference+Material+and+Knowledge+Transfer * @arxcruz Build containers with TCIB locally (and testing it) * May 18 - Doc on CI Framework * Chandan - zuul jobs ### New work item discovered by the team * Discuss with dfg:pidone to see if limits optimization can be set on rabbitmq pods so that we can avoid workaround on CI side. * https://github.com/openstack-k8s-operators/install_yamls/pull/255/files * https://github.com/openstack-k8s-operators/install_yamls/pull/255/files * documentation on Hive debugging for RRs * ysandeep will link the required pages * New crc flavors are coming up (Documention, may be in Ci-framework and monitoring): * 12vcpu_32GB - centos-9-stream-crc-3xl (https://softwarefactory-project.io/r/c/config/+/28348) * will increase the resource usage on cloud * Use this flavor wisely * 8vpcus_64GB - will come in future Existing flavors * centos-9-stream-crc-xxl - 24 GB (use it only for podified with network isolation and ceph) * centos-9-stream-crc-xl - 16 GB (use it only for podified without network isolation) * (marios) not really... we have had to switch to 24 once cinder is added * (chandan) Ah, thanks for sharing that. will document that AI: Add memory in the label name for easier identification * OVB support for compute nodes when running on Openstack for nextgen(Not for pre-provision nodes) * https://docs.openstack.org/sushy-tools/latest/user/dynamic-emulator.html#systems-resource-driver-openstack * fallout from master/main repo switch - scheduled for Monday * Original Jira: https://issues.redhat.com/browse/OSP-21542 ### Words from PM (Ronelle/Marios) * card-by-card review * prioritize the task ### Words from UA (Soniya) * Review Q2 goals and touch base/discussion with rlandy :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 * Design discussion needed (ysandeep/rlandy) :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-05-09 TC/UA/PM planning for sprint 79 --- --- ## 2023-04-20 Unified Sprint 78 Planning **Attendees:** bhagyashris, cjeanner, marios, chandan, arxcruz,jgilaber,ananya, Rachael, psathyan, dviroel :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members April 19 to May 10 (it's 14 days - $your_PTO_day) 1. rlandy: 14 2. marios: 13 (out may1) 3. chandan: 11 (1st May public holiday, 2nd May and 8th may travelling) 4. Ignacio: 12 (1st and 2ns May public holidais in Madrid, Spain) 5. Bhagyashri: 1st May holiday in India (May be 1 PTO) 6. Pablo: 12 (1st and 2ns May public holidais in Madrid, Spain) 7. Sandeep: 8. Soniya: 9. arxcruz: 13 10. Ananya: 13 (public holiday 1st May) 11. Douglas: 12 (holidays: 21th Apr and 1st May) 12. Dariusz: 6 (PTO) 13. Cedric: 11 (1st of may is public holiday, 2 weeks PTO starting May 8th) 14. Adrian: 15. Joan: 13 (public holiday May 1st) 16. Dor: 12 | 25-26th (public holiday) 17. psedlak: 14 - ~8 for ruck 18. afazekas: 19. psathyan: 12 (28th April & 01 May) > Total team days (14 days for 15 team members (+1 in RR shift)): ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 * 21-Apr-2023 to 27-Apr-2023: bhagyashri * 28-Apr-2023 to 4-May-2023: cedric * 5-May-2023 to 11-May-2023: ananya > next retrospective : 10 May : Doug :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Ananya will move the retro and planning to earlier slots * Talk to Robert - find out how to get epics to show up on sprint board so that we dont have to create duplicate stories * Get all the ci-frameworky stories under https://issues.redhat.com/browse/OSP-22840 epic * Need to sort cases where cards are being tracked on other boards * Find out why CI Framework First iteration tracking doesnt show up as a story on the board ### New topics or demos or education for community call * https://docs.engineering.redhat.com/pages/viewpage.action?spaceKey=OSP&title=CI+Framework+-+Reference+Material+and+Knowledge+Transfer - Put your names and book slots ### New work item discovered by the team * https://issues.redhat.com/browse/OSP-24135 Fix minor update jobs - no longer updating containers as intended * not clear how much work we will have to do (upgrades team leading - will meet tomorrow) ### Words from PM (Ronelle/Marios) * master main * master teardown https://issues.redhat.com/browse/OSP-24365 Depends-On: https://review.opendev.org/c/openstack/governance/+/877132 * zed next sprint ### Words from UA (Dariusz Smigiel/ Soniya) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board * Monday ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-04-18 TC/UA/PM planning for sprint 78 * Review Q1 * Map Q1 tasks that moved to Q2 * What are you starting to work on this sprint? * 5 mins to person by person tasks * New Q2 epics * Are epics missing? * yes : pls create :D * New items discovered * repos are moving from master to main (may have some fallout) * also operators will be taking in antelope podified built containers * Assign epics to people after stories are somewhat assigned --- --- --- --- ## 2023-03-30 Unified Sprint 77 Planning **Attendees:** marios, cédric, pojadhav (maternity leave onwards), bhagyashris,soniya29, rlandy, jgilaber, chandan :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members March 30 to April 19 (it's 14 days - $your_PTO_day) 1. rlandy: out April 5-14 (might drop into a few meetings) 2. marios: 13 days out fri 7 3. chandan: 13 days , 7th public holiday 4. Bhagyashri: 7th Holiday in India and May be 1 PTO () 5. Sandeep: 13 days , 7th public holiday 6. Soniya: 10 (PTO from 7th April to 13th April) 7. arxcruz: 11 (Apr 6, 7, 10) 8. Ananya: 10 days (out 6th to 11th) 9. Douglas: 10. Dariusz: 14 11. Cedric: 11.5 (2 public holidays (Apr 7-10), half-day (Apr 5)) 12. Adrian: 13. Joan: 11 (Apr 6-10) > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: > this week marios - then: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=931378567 * Votes: * abstain rlandy, marios * One person shift: cédric, ananya, arxcruz, chandan, dariusz, pojadhav, soniya29, bhagyashris * Usual: Dates | RuckRover -|-| 31 Mar - 6 Apr | marios 7 Apr - 13 Apr | chandan 14 Apr - 19 Apr | arx > next retrospective : Cédric :watch: (target: +0:15) + ### All the best Amol https://miro.com/app/board/uXjVMYBLDGU=/ ### Ideas for improvement to sprint process * RR schedule (voting ^) * Next gen jobs monitoring * put together links for monitoring * slack user group ### Q2 planning * https://docs.google.com/document/d/1yKDhibzgVdPy7wUurENVcY8coxKm5ESYpfsP72etBtA/edit# * ### New topics or demos or education for community call ### New work item discovered by the team ### Words from PM (Ronelle/Marios) ### Words from UA (Dariusz Smigiel) ### Notes for Q2 planning (Jira) * Q1 epics that do not close go to Q2 as new Epics * :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- --- --- --- --- ## 2023-03-10 Unified Sprint 76 Planning **Attendees:** marios, cedric, soniya29, pojadhav, rlandy, bhagyashris, arxcruz, jgilaber, ananya, chandan :watch: (target +0:00) +0:04 ### Team availability and PTO plansa #### Sprint team members March 9 to March 29 (it's 14 days - $your_PTO_day) 1. rlandy: 13 (PTO Friday March 24) 2. marios: 14 3. chandan: 14 4. Amol: 5. Bhagyashri: 13 (PTO 22nd March) 6. Pooja: 13 (PTO 22nd March) 7. Sandeep: 8. Soniya: 12 (2 days PTO probably in this week) 9. arxcruz: 14 10. Ananya: 14 11. Douglas: 5 (PTO on mar[20th,31th]) :beach_with_umbrella: 12. Dariusz: 13. Cedric: 14 14. Adrian: 14 15. Joan: 12 (PTO on march 13 and 24th) > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- Mar 10-16 | pooja | cedric Mar 20-24 | arx | sandeep Mar 27-31 | soniya | ananya > next retrospective : Chandan (29th) :watch: (target: +0:15) + ### Ideas for improvement to sprint process From retro: - github : - Should we use the ci-framework workspace to fork instead of our own? (easier to collaborate on a PR) - KT session on best practices on the github workflow? (brainstorm on Thursday) - Improve code security by leveraging code scanning in github actions? (We can enable this in our repos) [Example](https://github.com/openstack-k8s-operators/ci-framework/blob/main/.github/workflows/codeql.yml) - AI: repo-setup, tcib, ci repo in k8s operators - RR tasks: - KT session on Mixed Rhel jobs so that RRs can take over the CIXs on mixed rhel - Should RRs start monitoring Prow jobs? Vote - one regular and one prow - +1: ananya, bhagyashris - -1: arxcruz (for now), soniya29(for now), marios, pojadhav, cedric, doug - one RR: - +1 marios, chandan - -1 cedric (UNLESS we may have an emergengy contact) - keep things as they are - +1: soniya29, pojadhav, arxcruz (for now), cedric (depending on previous comment) - -1: - notes: - [?job=pull-ci-openstack-k8s-operators*](https://prow.ci.openshift.org/?job=pull-ci-openstack-k8s-operators*) - Discovering [Obsidian](https://obsidian.md/) - mind mapping and note taking tool. May help getting things clean in head - It seems that have to pay if you want to sync across devices? - yep, but it's plain .md files, so you can sync content using 3rd parties such as [syncthing](https://syncthing.net/) (not tested yet) - suggestion: [notion.so](https://notion.so) - How can we all help unified tooling efforts? ### New topics or demos or education for community call - Mixed Rhel jobs ? - github workflow brainstorm ### New work item discovered by the team - 30 mins time slot for Demo - https://docs.google.com/presentation/d/1H461gjIpq1cnVKOMGXBWlvHGB-oWRHA62TlLn7EMI6U/edit#slide=id.g1b71cb8bb39_38_0 - microshift pocing and job movement - Anterlope branching ? ### Words from PM (Ronelle/Marios) - glint - q2 themes ### Words from UA (Dariusz Smigiel) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-03-06 TC/UA/PM planning for sprint 76 * Demo design and building * https://issues.redhat.com/browse/OSP-21839 * Close out on current board tasks * ~~Implement CRC - mark as Q2 priority~~ * --- --- --- ## 2023-02-16 Unified Sprint 75 Planning **Attendees:** marios, chandan, ananya, arxcruz, dasm,bhagyashris, jgilaber, rlandy, :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members Feb 16 to March 08 (it's 14 days - $your_PTO_day - Day of Learning - Recharge day) 1. rlandy: 13 (out March 7) 2. marios: 13 (recharge day) 3. chandan: 11 (Feb 27, 28 PTO, Recharge Day) 4. Amol: 13 5. Bhagyashri: 24 Feb - recharge day (Might be 1 PTO) 6. Pooja: 13 (Recharge Day) 7. Sandeep: (06 March/07 March/recharge day) - 2 more PTO - TBD 8. Soniya: 9. arxcruz: 11 (probably less) 10. Ananya: 12 11. Douglas: (11 and 1/2 - Holiday on 21th and half 22th + Recharge) 12. Dariusz: 11 13. Cedric: 10.5 (DoL, Feb 22-23, Recharge) 14. Adrian: 15. Joan: 12 > Total team days (12 days for 13 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- Feb 17-23 | Soniya | Marios Feb 24-02 | Doug | Bhagyashri Mar 03-09 | Dariusz | Amol > next retrospective : March 8th - Bhagyashri :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Assigning buddy for new team members * Ping Ronelle if you need a buddy * Onboarding doc for openshift and all the next gen work: * KT links on confluence * Helpful openshift courses: * do180/do280/do380 * day of learning excel sheet (refer to confluence) * Team members can now take up cards to add one Prow workflow each to understand the process * Reducing frequency of queries from RR tool and/or killing the duplicate pages of Cockpit * Ananya will remove dupli pages * Add card for the optimization * Bring back happy hour? * +1: dasm, marios (in at least some format) * -1: ysandeep(Friday 08:00 pm for me), ananya (friday afternoon) * Suggestions: * Game nights (mornings for me? dasm :P) * Slack Chat thread on Fridays * gifs are allowed \o/ * we spend so much time on slack already. it limits face-2-face communication :( (dasm). i'm just 'old date' person (shrug) * we can start a huddle in our watercooler thread and you can have f2f if you want it or google meet if you prefer obv ### New topics or demos or education for community call * KT session on Prow (ci-operator and e2e tests) - doug * when? * Thursday 23th ### New work item discovered by the team * Improve logs gathering step (Prow) ### Words from PM (Ronelle/Marios) * Demo design on Friday's call - send to confluence * Container build on new line design * Cleanup discussion ### Words from UA (Dariusz Smigiel) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board High: [spike] Complete the breakdown of work associated with winding down TripleO Low: CI: FIPS jobs Backlog: - Hive and Downstream Zuul POC - Validate EDPM via tempest - Resolve lack of resources for upstream check/gate testing ### General discussion of sprint scope/topics IRC thread: Thread: No thread: :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-02-14 TC/UA/PM planning for sprint 75 * Demo design and building * https://issues.redhat.com/browse/OSP-21839 * Container build/test/push workflow * Minimization of zed/master check/gate/integration/component * Requirements gathering and POC for unified tooling * CI Framework repo * Board review: * what stays to be finished up? * E2E prow on all operators * Precommit * Kuttl on operators and wired in to prow jobs * Tempest API on all operators and wired up to run * EDPM * install-yamls wrapper * improve tests * Molecule * Mixed RHEL? * Adoption POC? * Infra work * FIPs * what can be unprio for Q2 * Hive on PSI * Tempest on EDPM * Resources --- --- ## 2023-01-25 TC/UA/PM planning for sprint 74 * All modernization (expect FIPS and minimal Infra) * Demo expectations - OSP-21490 * OSP-21839 - JP wants us to demo what types of tests are available and how DFGs can start implementing them (prow E2E, kuttl, tempest, zuul-based for EDPM, how you would 'depends-on', what tests are on new repos, integration example (stretch)) * User stories - became KR1 * EDPM split * Sanity Check for edpm-ansible role * Molecule Jobs * Consuming EDPM-ansible bits in CI jobs * Tasks for consuming proper openstack services containers in CI job * Status of installed operator and services * Hive PSI integration line started * dasm: Logging and Reporting * logging for podified control plane logging * External compute node logging * Tempest * Periodic lines * First Adoption Test * Precommit Testing (Amol) - card OSP-21768 * Sandeep: Adding details so that Amol can pick things up. * openstack/operator/nova/placement/ansibleee already have pre-commit job at this point. * Rabi proposed pre-commit config for few repos today. * Glance: https://github.com/openstack-k8s-operators/glance-operator/pull/132 * Ovs: https://github.com/openstack-k8s-operators/ovs-operator/pull/44 * Mariadb: https://github.com/openstack-k8s-operators/mariadb-operator/pull/53 * We need to add coverage for pre-commit job in all the operators. * Example: https://github.com/openshift/release/pull/35600 * Get rid of duplicate individual jobs which are covered in pre-commit and once we have pre-commit job running. --- ## 2023-01-05 Unified Sprint 73 Planning **Attendees:** marios, Cédric, arxcruz, ananya, bhagyashris, ysandeep, dasm, rlandy, akahat, jgilaber, doug, :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members Jan 05 to Jan 25 (it's 14 days - $your_PTO_day) 1. rlandy: 14 2. marios: 14 3. chandan: 11 (public-holiday - 26th Jan, might swap & 22nd Jan) 4. Amol: 14 (public holiday - 26th Jan) 5. Bhagyashri: 13 (public holiday - 26th Jan) 6. Pooja: 11 (public holiday - 26th Jan, 2 PTOs) 7. Sandeep: 13 (public holiday - 26th Jan) 8. Soniya: 12 (public holiday - 26 jan + 2 ptos) 9. arxcruz: 13 10. Ananya: 14 11. Douglas: 9 (pto from 9th to 13th) 12. Dariusz: 14 13. Cedric: 14 14. Adrian: 10 (from 06 to 23) 15. Joan: 13 (public holiday - Jan 6th) > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- Dec 30-05 | pooja | amol Jan 06-12 | sandeep | marios Jan 13-19 | soniya | arx Jan 20-26 | bhagyashri | cedric/tengu > next retrospective : Arx Cruz on 25th Jan 2023 :watch: (target: +0:15) + ### Ideas for improvement to sprint process ### New topics or demos or education for community call * Training - EDPM (Chandan) ### New work item discovered by the team * Modernization (with requirements from real PM this time) * [CI Next Gen Plan - 2023 - First Quarter](https://docs.google.com/document/d/1KiySkRKyRO3z46Y7COTFDTczMDrx_pBktdtzqIQ-1g0/edit#heading=h.m0f70jydpjmv) * https://docs.google.com/document/d/1YNZaROFFlIH6nGmOEj5Z8vYdZcm7cnc1mbwQ9XtrXUs/edit * https://docs.engineering.redhat.com/pages/viewpage.action?spaceKey=OSP&title=CI+Framework+Modernization * https://issues.redhat.com/secure/Dashboard.jspa?selectPageId=12343990 * Multi-RHEL * OSP-18 standup * Current Business: * C9 infra reviews * FIPS * Release Delivery deliverables * els container base * move to rhel 9.2 * Training * Chat channels * IRC * slack * channels : #osp-podified-ci, #openstack-k8s-operators * how to join slack:- https://docs.engineering.redhat.com/display/OSP/CI+Framework+Modernization * Compliance Training ### Words from PM (Ronelle/Marios) ### Words from UA (Dariusz Smigiel) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting --- ## 2023-01-30 Unified Sprint 74 Planning **Attendees:** Cedric, ananya, bhagyashris, chandan, pojadhav, arxcruz,jgilaber, ysandeep, dasm, mario, doug, rlandy :watch: (target +0:00) +0:04 ### Team availability and PTO plans #### Sprint team members Jan 26 to Feb 15 (it's 14 days - $your_PTO_day) 1. rlandy: 13 2. marios: 13 (out one day) 3. chandan: 13 4. Amol: 12 ( 2 Days PTO ) 5. Bhagyashri: 14 6. Pooja: 11 (3 days PTOs) 7. Sandeep: 12 (out one day) 8. Soniya: 9. arxcruz: 14 10. Ananya: 14 11. Douglas: 9 (Feb 6-10 pto) 12. Dariusz: 14 13. Cedric: 13.5 (out: Feb 13 afternoon) 14. Adrian: 15. Joan: 14 > Total team days (14 days for 11 team members (+2 in RR shift)): > 11*13 / 143 (100% of total capacity) ### Ruck / Rover > New ruck / rover: https://docs.google.com/spreadsheets/d/1-p0MU38u4NAOqNC_fPIgmRfcrCrSftdbf8CLA9K_JuI/edit#gid=139559960 Dates | Ruck | Rover -|-|- Feb 03-09 | dariusz | chandan Feb 10-16 | sandeep | ananya Feb 17-23 | soniya | marios > next retrospective : Ananya on 15th Feb 2023 :watch: (target: +0:15) + ### Ideas for improvement to sprint process * Slack vs IRC (from retro) * Which meetings to keep / which meeting to dedicate for KT / Community call stays or goes (from retro) ### New topics or demos or education for community call https://docs.google.com/document/d/1V9I1EPe9D5gvts_qxviCdLsRHkOdQtmCE0ZHWCFZXcw/edit First: * Introduction to Prow and job addition/modification workflow - Thursday ### New work item discovered by the team * All modernization (expect FIPS and minimal Infra) * Demo expectations - [OSP-21490](https://issues.redhat.com/browse/OSP-21490) * [OSP-21839](https://issues.redhat.com/browse/OSP-21839) - JP wants us to demo what types of tests are available and how DFGs can start implementing them (prow E2E, kuttl, tempest, zuul-based for EDPM, how you would 'depends-on', what tests are on new repos, integration example (stretch)) * User stories - became KR1 - [OSP-21240](https://issues.redhat.com/browse/OSP-21240) * cjeanner working on them right now * [CI Stories](https://docs.google.com/document/d/1jgs7KolYiyNocY35JrBIIbnv3Boazfc71dUc-00obY4/edit) * [QE Stories](https://docs.google.com/document/d/1oAULlOsrW3THqdKDwm3VQIy3G0b-RRGblFiKH1Ed8H8/edit) * [Dev Stories](https://docs.google.com/document/d/1ZFt1CgpXU7R7YdJe9oMepjrGl6F8IAYou9wK-BXcjys/edit) * [Customer Support stories](https://docs.google.com/document/d/1l9q9s0LQ835G3w1LHnC2uEqGsI-hWgkrjTQezqbhD_0/edit) * Will send mail later this week to gather feedback and content * EDPM split - Bhagyashri intrested * Sanity Check for edpm-ansible role * Molecule Jobs * Consuming EDPM-ansible bits in CI jobs * Tasks for consuming proper openstack services containers in CI job * Status of installed operator and services * Implement test for the project replacing the ones we had on zuul (Adrian) [OSP-21740](https://issues.redhat.com/browse/OSP-21740) - Which zuul tests should we replace? * Hive PSI integration line started * job to clean floating-ips (exclude Hive FIPs) * role/job to claim/delete OCP cluster using Hive * dasm: Logging and Reporting * logging for podified control plane logging * External compute node logging * Tempest * Periodic lines * Periodic job in prow(Sandeep) * Full OCP cluster (3 master + 1 worker). * Install cluster on demand from hive - no cluster on standby to save resources. * Inputs - We use meta-operator defaults, no building of operator images. * First Adoption Test * Precommit Testing (Amol) - card [OSP-21768](https://issues.redhat.com/browse/OSP-21768) * Sandeep: Adding details so that Amol can pick things up. * openstack/operator/nova/placement/ansibleee already have pre-commit job at this point. * Rabi proposed pre-commit config for few repos today. * Glance: https://github.com/openstack-k8s-operators/glance-operator/pull/132 * Ovs: https://github.com/openstack-k8s-operators/ovs-operator/pull/44 * Mariadb: https://github.com/openstack-k8s-operators/mariadb-operator/pull/53 * We need to add coverage for pre-commit job in all the operators. * Example: https://github.com/openshift/release/pull/35600 * Get rid of duplicate individual jobs which are covered in pre-commit and once we have pre-commit job running. ### Words from PM (Ronelle/Marios) ### Words from UA (Dariusz Smigiel) :watch: (target: +1:00) +00:47 ### Sprint board Review https://issues.redhat.com/secure/RapidBoard.jspa?rapidView=11751 :watch: (target: +1:45) + ### Priority for this sprint on board ### General discussion of sprint scope/topics :watch: (target: +2:00) + ### End Of Meeting ---