# Rework Downstream Baremetal environment ###### tags: `Design` # Plan - Where we will utilize our 5 environments * ENV A - 17/rhel9 Component line * ENV B - 17/rhel9 Integration line - Done * ENV C - Upstream Centos-9 master integration line * ENV D - 16.2 Integration line - Done * ENV E - 17/rhel8 Integration line ## ENVA - 17/rhel9 Component line Currently running stable on enva rhel8 baremetal component * This environment have some additional nodes which currently we don't utilize because job is running long(gets timeout at 6 hours) and we can't test more there. * I am trying to optimize pre-undercloud deploy time, Its taking long because we are using force_tcg param during image conversion. * We can test Ceph based deployment here ## ENVB - 17/rhel9 Integration line periodic-tripleo-ci-rhel-9-bm_envB-3ctlr_1comp-featureset001-rhos-17 :notes: Same as envA it have some additional nodes which we will utilize for ceph testing/scale up/composable roles. ## ENVC Upstream Centos-9 master integration line Centos-9 installation - done * currently failing on undercloud setup: https://code.engineering.redhat.com/gerrit/c/openstack/tripleo-ci-internal-jobs/+/398576 ## ENVD - 16.2 Integration line - Already working * [16.2 BM is already Up and running ](https://sf.hosted.upshift.rdu2.redhat.com/zuul/t/tripleo-ci-internal/builds?job_name=periodic-tripleo-ci-rhel-8-bm_envD-3ctlr_1comp-featureset035-rhos-16.2) ## ENVE - 17/rhel8 Integration line Currently running stable on enva rhel8 baremetal component * Currently in 17 tripleo component line * Failing because boot mode is set to bios * We have Switched boot mode to uefi/ Switch to use overcloud-full image TO-DO: * Switch this job to run in integration line instead, # Other Issues * Run virt-customize on the provided image - Taking ~2 hours. * Investigate why node cleaning is disabled on baremetal nodes. * https://code.engineering.redhat.com/gerrit/c/tripleo-environments/+/320433