# Pre RAN2#125bis coordination on Rel-19 ###### tags: `Construction` ## Mobility ## AI for air-interface ## AI based Mobility ## XR ## LP-WUS (Low Power-Wake Up Signal) * WUS ![截圖 2024-04-10 下午1.22.54](https://hackmd.io/_uploads/HJAIXomlA.png) ## NES * On-demand SSB SCell operation * On-demand SIB1 * UE will transmit UL WUS to NES cell and receive on-demand SIB1 from NES cell, after obtaining the WUS configuration from the NES Cell MIB or pre-configuration;(De-priority)