Testground Weekly (45 mins)
===
###### tags: `IPFS` `Testing`
:::info
- **Host:** Rob Matarangas
- **Notetaker:** @Rob.Matarangas
- **Location:** https://protocol.zoom.us/j/5411556559
- **Date:** June 9, 2020 4:00 PM (UTC)
- **Participants:** (please add)
- @raulk
- @RobM
- @cory
- PR for TAAS queue R3 https://github.com/testground/testground/pull/1051
- Draft PR for a basic implementation of TAAS R2 & R4 based on the 1051 storage layer. https://github.com/testground/testground/pull/1059
- one-off cluster for drand team with simple scaling up and down using a kubernetes cron
-
- @anton
- @
- **Agenda**
1. Sprint Update `30min`- TBD
2. Identify blockers / Tech Design Q&A `15min`
3. This week's planning `15min`
- **Reference:**
- [Last week meeting minute 2020-06-2](https://github.com/ipfs/testground/blob/master/_meeting-notes/2020-06-2.md)
- [HOW_WE_WORK.md#weekly-sync](https://github.com/ipfs/testground/blob/master/docs/HOW_WE_WORK.md#weekly-sync)
- [KanBan Board](https://app.zenhub.com/workspaces/testground-agile-5e55a12c82aac7fef146176e/board)
:::
## :mega: Update (Done, Shipped, Made Progress)
> To be reviewed Async
- ==@raulk==
- Got done
- tbd
-
- In progress
- tbd
-
- Didn't get done (and had commited to last week)
- N/A.
- Blocked
- N/A.
- ==@nonsense==
- Got done
- tbd
- In progress
- tbd
- Didn't get done
- tbd
- Blocked
- N/A.
- ==@hacdias==
- OOO - Exams + School
- ==@cory==
- Got done
- tbd
- In Progress
- tbd
-
- Didn't get done
- a satisfying answer to oom prom.
- Questions:
- tbd
- ==@Hugo==
- Got done
- tbd
- In Progress
- tbd
- Didn't get done
- tbd
## :question: Agenda, Questions (Blockers, Technical Design needs)
### Filecoin Pivot
- Finish open items
- https://github.com/testground/testground/pull/1051 should merge current progress by tonight- June 9th
- Storm testplan 877 can be merged in it's current progress state. Merge June 9/10th
- Use litmus test " can I finish this in next 48hrs or by removing myself at this time would I invalidate all prior work?"
- What open tickets fall under this litmus test for v0.5.2?
- Do we want a formal Release for v0.5.2 ? Mainly compiles with MacOs
- Release mgr? Cory. reminder to use checklist
**Testground/Infra Repo Refactor Design Review**
- Progress update
- Next steps?
- notes
---
- ### Testground/TaaS Requirements Detail Discussion
- notes
- Place-holder : Please add any additional Design Review Requests here for addition to next agenda
---
### Blockers
- n/a. Will address once Filecoin strike team goals are complete
---
- Still on Radar. Need to look into fault tolerances, set standards into the design
- This is for a future sprint. Need issue to flesh out and work on design
- Stages?
- take one testplan (e.g.pubsub) and measure and annotate the failures for tolerance or improvement.
-
## :dart: Next
- Taas Requirements ticket estimations - **Tabled** will resume after Filecoing pivot
- Questions? eg spikes needed to determine scope?
- Other Tickets to be opened. What and who?
#
-
### Sprint Plan for Filcoin Strike Team
-More active than TG sprint process.
-Continuos delivery process.
-Shorter sprints (1 week) Mon-Fri
-Daily sync standups updates.
-High-level sprint planning defined upfront
-frequent colos
-weekly demos, i.e. testplans
-created issues will contain specific success criteria
#### Action Items/Deliverables for Filecoin Pivot
- @Raul
- Testground inventory details
- Execution Plan
- Work with Rob to publish Sprint 1 Feature Plan -tbd
- Confirm new Strike Team members
- @Nonsense
-Merge Storm Testplan PR
-ramp up on filecoin system understanding, lotus codebase, climb the learning curve
- @Cory
-Merge 1051 PR
-ramp up on filecoin system understanding, lotus codebase, climb the learning curve
- @RobM
- Configure new Project Board
- On-board new dev team members and introduce 'How we work' sprint plan
### Any re-prioritizations, re-assignments, concerns ?
- TaaS Product Roadmap - TABLED
- features revolve around
- Shared Cluster-Anton primary
- Github Automation/Integration-Raul primary
- Comparative Matix/dashboards-
- Team sourced Design Requirement Doc is (same as above) https://docs.google.com/document/d/19dA5SsiVDt43rnaSiaxNtXYYBN_MVaikvi0JFvpYlos/edit?ts=5ecaad42#heading=h.ootea6yezqkg
### Top 3 things to get done this week
- **Wrap up any outstanding work** in Testground (PRs, draft code, etc.), and lock in the Testground-as-a-Service execution plan, so we can resume from a clean break off point when we get back to Testground in Q4.
- **Ramp up on filecoin system understanding**, lotus codebase, climb the learning curve, help populate the test inventory (details forthcoming)
### Assignments
See ZenHub Kanban Board for granular details: (https://app.zenhub.com/workspaces/testground-5db6a5bf7ca61c00014e2961/board?milestones=Testground%20v0.2%232020-02-14&repos=197244214).
- ==@Robm==
- ... facilitate productivity of team with focus on delivering Viable Testrgound Product in Q2
- ==@raulk==
- Defining the roadmap and plan for v1.0. See above linked doc
- ==@nonsense==
- ..Sprint progress
- ==@cory==
- ..Sprint progess
- ==@Hugo==
- ..JS Browser spec document with Raul
:::info
When the meeting is over, push notes to https://github.com/testground/pm/tree/master/_meeting-notes and verify that ZenHub is up to date https://app.zenhub.com/workspaces/testground-agile-5e55a12c82aac7fef146176e/board
:::