# マイルストーン例
GREVO Co., Ltd.
Date: 2020-03-02
Writer: W.Ishizuka
<hr>
## Amanotes のドキュメントの例
### 1st Checkpoint **CHECKLIST**
- Day0 to Day11
1.1 AmaSDK has been successfully integrated into the project and builds are successfully exported.
1.2 Core gameplay is applied on 1 demo track.
1.3 Defined camera angle/perspective.
1.4 Basic art/in-game asset, animation and environment.
1.5 1st checkpoint is completed in 9 working days.
### 2nd Checkpoint
- Day11 to day 30
2.1 Prepare and provide more songs for the game
2.2 Start working and implementing art/graphic into the build
2.3 Provide a build with art/graphic implemented
2.4 Intensively deliver feedback on the build with art/graphic implemented in 1 week
2.5 Polish the art/graphic + gameplay/level design based on Amanotes' team feedback
2.6 Provide a build with new songs implemented
2.7 Edit content (notes arrangement in the tracks)
2.8 Complete the 2nd Checkpoint
### 3rd Checkpoint
- Day30 to Day42 ()
3.1 Work towards the 3rd Checkpoint
3.2 Feedback along the way (if any)
3.3 Final check & Complete the 3rd Checkpoint
3.4 Upload the build onto the store
3.5 Set up UA Campaign
### Soft-Launch1
- Day43 to Day47
<hr>
## GREVO版改良案
上記の柔らか版